1/2

Burj Khalifa MEP Retrofit

There are few examples of buildings engineering design going beyond the wide spread applicable codes and standards. The design and construction of Burj Khalifa is definitely one of those examples. As part of the advanced and state-of-the-art predictive maintenance routines at the Burj, a project to retrofit the existing chilled water system supplying the top floors of the super tall building was commissioned. GRFN provided the engineering design and supervision of the retrofit which positioned the newly installed chillers system in the tower as the current highest chillers installation in the world.

Client

Emaar - Leaders Fort

Location

Dubai, UAE

Type

Mixed Use

Services

Building Services Engineering; Construction Supervision

  • linked in
  • Instagram

Office 132, Matloob Building Block B

Sheikh Zayed Road (Interchange II)

Dubai, United Arab Emirates

T: +971 4 379 0101 | F: +971 4 379 0202